Mine Planning – Attainment and Adherence

January 6, 2022 | No related items found.

Related Services

Related Industry

Share This Article

Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Plan Attainment

7%

Improvement over the last 4 months

8%

Improvement over the last 4 weeks

Plan Adherence

13%

Improvement over the last 4 months

11%

Improvement over the last 4 weeks

The challenge

Plan Attainment tells us how many of our planned tons were mined. Plan Adherence tells us if those tons were mined from the correct location. Mining in the correct location allows the Process Plant to maximize the recovery of gold. It also reduces unnecessary equipment movement in the pits and keeps our Drills, Dozers, Loaders and Haul Trucks synchronized. Eliminating unplanned equipment movements also creates a safer working environment.

The IAMALLIN Team created an Opportunity Matrix to define and rank reasons for variance such as equipment downtime and how we manage water in the pits due to the heavy rainfall in Suriname. More than a dozen reasons for variance were ranked based on the impact to moving tons and producing gold ounces.

These challenges are topics of focus in our daily leadership meetings and shared in our shift lineout meetings. Members of Planning, Operations, and Maintenance are now conducting weekly trips through the pits, working as one team, to ensure we manage our challenges as soon as possible and to escalate decisions if needed.

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2024/08/27
Permit to work compliance rises with Management Control System

Operational Excellence

Case Studies

2024/08/27
Rotating Equipment Management Improves in LNG Plant

Operational Excellence

Case Studies

2024/08/27
Turnaround effectiveness improves for LNG plant with clarified KPIs

Operational Excellence

Case Studies

2024/08/15
Refinery reduces total maintenance downtime by 25%

Operational Excellence

Case Studies

2024/08/12
Oil refinery increases throughput by 34%

Operational Excellence

Case Studies

2024/08/09
Aviation fuel company reduces maintenance backlog by 28%

Operational Excellence

Case Studies

2024/08/05
Energy company reduces maintenance backlog by 70%

Operational Excellence

Case Studies

2024/08/02
Medical centre cuts delay, adds annual operating room hours by 5,500

Connect with us

Let us work with you to achieve exceptional results.