Mine Operations – Reducing Wait Time

January 6, 2022 | No related items found.

Related Services

Related Industry

Share This Article

Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Loaders waiting for Trucks

4%

Improvement over the last 4 months

12%

Improvement over the last 4 weeks

Trucks waiting for Loaders

10%

Improvement over the last 4 months

16%

Improvement over the last 4 weeks

The challenge

In the pits we must carefully balance the number of trucks assigned to each Shovel (or “Loading Unit”). If the Shovel does not have enough Haul Trucks, it cannot be fully productive. If it has too many, then the Haul Trucks are not productive.

Rosebel’s Dispatch Office is where this balance of equipment is measured. The cycle of each Haul Truck is monitored in real-time from the location where it is loaded, the route it travels (roads and ramps), where it is dumping, and the return path to the next load. Dispatchers work with Mine Operations and Mine Planning to optimize these movements in a way that reduces traffic and waiting time for both fleets: the Loading Units and the Haul Trucks.

Operators, Supervisors and General Foremen communicate with Dispatchers throughout the shift to share information on road conditions, visibility and equipment maintenance considerations. Orchestrating this balance of fleets in a safe and efficient manner is truly a Team effort

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2024/08/27
Permit to work compliance rises with Management Control System

Operational Excellence

Case Studies

2024/08/27
Rotating Equipment Management Improves in LNG Plant

Operational Excellence

Case Studies

2024/08/27
Turnaround effectiveness improves for LNG plant with clarified KPIs

Operational Excellence

Case Studies

2024/08/15
Refinery reduces total maintenance downtime by 25%

Operational Excellence

Case Studies

2024/08/12
Oil refinery increases throughput by 34%

Operational Excellence

Case Studies

2024/08/09
Aviation fuel company reduces maintenance backlog by 28%

Operational Excellence

Case Studies

2024/08/05
Energy company reduces maintenance backlog by 70%

Operational Excellence

Case Studies

2024/08/02
Medical centre cuts delay, adds annual operating room hours by 5,500

Connect with us

Let us work with you to achieve exceptional results.