Our client, one of the world’s leading mid-tier gold mining company.

Key Results

CAT 785

19%

Improvement over the last 4 months

23%

Improvement over the last 4 weeks

KOM HD785

22%

Improvement over the last 4 months

25%

Improvement over the last 4 weeks

The challenge

The Mine Maintenance Team developed initiatives that increased truck availability, improving work quality and maintenance practices. With the help of these initiatives, the maintenance department was able to reduce downtime and costs related to equipment failures.

The efforts included the implementation of a first-class maintenance methodology such as SMED (Pit Stop Work Modes, Quality Inspections, and Short intervals. The initiative helped to ensure that all necessary tools, spares, and skills were available before haul trucks arrived at the shop. As a result, we were able to shorten the time each haul truck was in the shop, enabling all haul trucks to return to service sooner.

We joined efforts with other areas, such as Wenco, to monitor and calibrate payload using a calibrations system. By doing so, we reduce the impact caused by excessive payloads affecting the chassis on older units. Furthermore, we minimized tire rotation cycle times and Preventive Maintenance durations with the Pit Stop initiative, but we took this to another level by considering the cost factor. We added the Kidney-Looping process to reduce the consumption of lubricants extending the life of the lubricants’ replacement from the expected 1000 hours to 4000 hours.

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2024/08/27
Permit to work compliance rises with Management Control System

Operational Excellence

Case Studies

2024/08/27
Rotating Equipment Management Improves in LNG Plant

Operational Excellence

Case Studies

2024/08/27
Turnaround effectiveness improves for LNG plant with clarified KPIs

Operational Excellence

Case Studies

2024/08/15
Refinery reduces total maintenance downtime by 25%

Operational Excellence

Case Studies

2024/08/12
Oil refinery increases throughput by 34%

Operational Excellence

Case Studies

2024/08/09
Aviation fuel company reduces maintenance backlog by 28%

Operational Excellence

Case Studies

2024/08/05
Energy company reduces maintenance backlog by 70%

Operational Excellence

Case Studies

2024/08/02
Medical centre cuts delay, adds annual operating room hours by 5,500

Connect with us

Let us work with you to achieve exceptional results.