We are a global management consultancy that delivers exceptional outcomes and sustainable change

We are a global management consultancy that delivers exceptional outcomes and sustainable change

Case Studies

Mine Operations – Reducing Wait Time

January 6, 2022 | No related items found.
Related Services
Related Industry
Share This Article

Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Loaders waiting for Trucks

4%

Improvement over the last 4 months

12%

Improvement over the last 4 weeks

Trucks waiting for Loaders

10%

Improvement over the last 4 months

16%

Improvement over the last 4 weeks

The challenge

In the pits we must carefully balance the number of trucks assigned to each Shovel (or “Loading Unit”). If the Shovel does not have enough Haul Trucks, it cannot be fully productive. If it has too many, then the Haul Trucks are not productive.

Rosebel’s Dispatch Office is where this balance of equipment is measured. The cycle of each Haul Truck is monitored in real-time from the location where it is loaded, the route it travels (roads and ramps), where it is dumping, and the return path to the next load. Dispatchers work with Mine Operations and Mine Planning to optimize these movements in a way that reduces traffic and waiting time for both fleets: the Loading Units and the Haul Trucks.

Operators, Supervisors and General Foremen communicate with Dispatchers throughout the shift to share information on road conditions, visibility and equipment maintenance considerations. Orchestrating this balance of fleets in a safe and efficient manner is truly a Team effort

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Popular Reads
Ready to improve your No related items found.?
Further Reading

Operational Excellence

Case Studies

2025/10/21
Middle Eastern food and beverage company reduces expiry returns to 2.18%, unlocking US$839K in value

Operational Excellence

Case Studies

2025/10/16
How a global oil and gas company reduced maintenance backlogs by 30%

Operational Excellence

Case Studies

2025/10/16
24% OEE and 22% Productivity gains for Asian leading wood panel manufacturer

Operational Excellence

Posts

2025/10/10
How to Measure and Improve Shop Floor Productivity to Drive Manufacturing Growth

Digital Transformation

Case Studies

2025/10/10
Brazilian energy provider reduces manual workload by 16% after process automation 

Operational Excellence

Case Studies

2025/10/10
India’s Leading CDMO Overhauls Systems, Driving Operational Excellence

Operational Excellence

Case Studies

2025/10/09
Tractor Manufacturer Achieves 40% Increase in Average First Pass Yield

Operational Excellence

Case Studies

2025/10/09
Webbing Maker: 30% Waste Reduction. Better Quality Product